Anthropic CCA-F (Claude Certified Architect - Foundations (CCAR-F)) Practice Test 9

Question 80

A dispatcher acknowledges a submitted analysis job before recording it anywhere durable. Its process then crashes, and the job disappears. Which ordering prevents this loss?

  1. Mark the job complete when acknowledgment is sent.
  2. Persist an accepted job in a recoverable queue or store before acknowledging acceptance.
  3. Acknowledge earlier and rely on the caller never checking again.
  4. Keep the job only in a model's conversation summary.

Explanation

Correct Answer

B:

Durable acceptance lets another process recover the job after a dispatcher failure.

Incorrect Answers

A:

Acceptance records an obligation to process work, not evidence that processing finished.

C:

An earlier acknowledgment widens the period in which accepted work can vanish.

D:

A generated summary is not a durable dispatch record with recoverable execution semantics.

Question 81

A worker can delegate further subtasks. What additional control prevents uncontrolled recursive expansion?

  1. Give every descendant the parent's full remaining budget.
  2. Hide descendant activity from logs.
  3. Enforce shared depth, task-count, and resource limits across descendants.
  4. Apply a depth limit to each worker's direct children but restart the depth counter whenever a child delegates to another worker.
  5. Require every descendant to use a different display name.

Explanation

Correct Answer

C:

Recursive delegation needs aggregate bounds. The controller must account for the whole task tree, not only each worker's local limit.

Incorrect Answers

A:

Repeated inheritance can multiply total spending beyond the intended ceiling.

B:

Reduced observability makes runaway expansion harder to detect.

D:

Resetting the counter at each generation permits effectively unlimited descendant depth. The limit must apply across the delegation tree.

E:

Unique names improve attribution but do not limit resource growth.

Question 82

A worker is restarted after requirements change, but its earlier run later returns a result. What prevents the old result from overwriting the current answer?

  1. Version assignments and returned results.
  2. Choose the longer result.
  3. Accept whichever result arrives last.
  4. Remove task identifiers from returned messages.

Explanation

Correct Answer

A:

The coordinator can reject results belonging to superseded requirements. Completion time alone does not establish which task version produced a result.

Incorrect Answers

B:

Length does not indicate applicability to the latest requirements.

C:

A slow obsolete run can finish after the current run.

D:

This eliminates the evidence needed to distinguish current from stale work.

Question 83

Each worker's module tests pass, but the combined application fails because interfaces disagree. Which missing gate addresses this?

  1. More repetitions of the same isolated unit tests.
  2. Run integration checks against the assembled change and reconcile interface contracts.
  3. Accept each worker's declared interface without testing how its consumers use it.
  4. Require complete statement coverage in each module but continue testing modules only in isolation.

Explanation

Correct Answer

B:

Independent success does not prove composed correctness. The coordinator must validate interactions between modules after combining their work.

Incorrect Answers

A:

Local tests can continue passing while cross-module assumptions remain inconsistent.

C:

Local declarations can look valid while disagreeing on formats, units, or call order. Assembled checks exercise the interaction where the observed failure occurs.

D:

Statement coverage does not establish that two modules exchange compatible values. The missing evidence concerns their combined behavior.

Question 84

Worker A changes a public interface; worker B adapts callers to the new interface. What must the integration plan capture?

  1. A rule to discard whichever change finishes first.
  2. The dependency between interface and caller changes and a coherent combined revision.
  3. Only each worker's preferred completion time, without the interface dependency.
  4. Merge the interface change first and treat temporary caller failures as proof that the adaptation can be skipped.

Explanation

Correct Answer

B:

The integration must avoid leaving callers and interface at incompatible versions. Coordinated commits or an explicit migration sequence can preserve consistency.

Incorrect Answers

A:

Discarding a necessary half of the migration leaves an incomplete implementation.

C:

Scheduling preferences do not preserve compatibility between the changed interface and its consumers.

D:

The caller failures show why the dependent change is needed. Integration must preserve a compatible combined state rather than discard the work required by the new interface.

Question 85

An agent repeatedly rewrites its plan but makes no tool calls or artifact changes. Which progress signal would be more meaningful?

  1. How consistently the agent restates each milestone without recording its completion.
  2. Verified completion of defined milestones or new task-relevant evidence.
  3. How many revised plans the agent produces during the run.
  4. The frequency of confident status messages.

Explanation

Correct Answer

B:

Progress should be tied to observable state changes and resolved questions. This distinguishes useful planning from an unproductive narrative loop.

Incorrect Answers

A:

A precise restatement can still describe planned work that has not changed the artifact or produced new evidence.

C:

Repeated planning can be necessary, but plan count alone cannot distinguish useful adaptation from a loop with no task progress.

D:

Confidence language is not evidence of completed work.

Question 86

A support agent must hand a failed case to a human. Which handoff best reduces repeated investigation?

  1. Include unrelated customer records for completeness.
  2. Send a success summary to avoid alarming the operator.
  3. Include the user's goal, actions attempted, observed failures, current state, and unresolved decision.
  4. Send only a generic escalation flag.
  5. Send only the most recent error message, assuming the human can infer the user's original objective and all prior attempted actions.

Explanation

Correct Answer

C:

A focused handoff preserves the evidence and limits of prior work. The operator can continue without reconstructing the entire interaction.

Incorrect Answers

A:

Unnecessary records increase exposure and distract from the actual case.

B:

Misstating the outcome conceals the very failure that requires escalation.

D:

A flag routes the case but omits the information needed to resolve it efficiently.

E:

The final error alone can omit the reason for the task, earlier side effects, and failed recovery attempts, forcing the human to repeat investigation.

Question 87

A workflow pauses for approval, but no approval arrives before the reservation expires. What should the controller do?

  1. Treat elapsed time as implied approval.
  2. Execute using the expired reservation without checking.
  3. Keep reporting that the reservation is active indefinitely.
  4. Expire the pending action and revalidate availability before any later approved execution.

Explanation

Correct Answer

D:

Approval and resource validity are separate preconditions. A late decision cannot revive stale state without a fresh check.

Incorrect Answers

A:

Silence does not authorize a consequential action.

B:

The reserved resource may no longer be available or valid.

C:

The report would contradict the known expiry condition.

Question 88

A worker only needs read access to a specific project dataset. Which credential design limits damage from mistakes?

  1. Reuse the coordinator's organization-wide administrator credential.
  2. Let the worker choose its own permission scope.
  3. Place the administrator password in the worker prompt with a warning.
  4. Issue narrowly scoped access for the required dataset and operations.

Explanation

Correct Answer

D:

The execution identity should match the assigned capability. Restricting resources and actions reduces the impact of erroneous or adversarially influenced requests.

Incorrect Answers

A:

Broad authority exposes unrelated resources and operations beyond the worker's task.

B:

The component being constrained should not grant itself broader access.

C:

A warning does not reduce the credential's authority and increases secret exposure.

Question 89

A shared coordinator serves multiple customers. What must accompany worker tasks to avoid cross-customer data access?

  1. The last tenant used by any worker.
  2. Only the customer's display name in prose.
  3. A larger shared memory containing all customer records.
  4. An authenticated tenant context enforced by downstream data access.

Explanation

Correct Answer

D:

The backend must bind every operation to the correct tenant. Prompt context can describe the task, but authorization must not rely solely on generated identifiers.

Incorrect Answers

A:

Shared process history does not determine the current request's tenant.

B:

Names can be ambiguous and are not an enforceable authorization context.

C:

Combining records increases exposure rather than enforcing separation.

Question 90

An agent proposes an operation name not registered by the application. What should the dispatcher do?

  1. Install a package named after the proposed operation.
  2. Evaluate the name as arbitrary application code.
  3. Choose the nearest spelling automatically for every operation.
  4. Reject unknown operations and return a controlled error.

Explanation

Correct Answer

D:

The dispatcher should execute only explicitly registered capabilities. A generated name cannot create a new authorized function.

Incorrect Answers

A:

A generated identifier does not authorize software installation or establish implementation trust.

B:

This turns model output into unrestricted execution rather than constrained tool use.

C:

A similar name may have different side effects; silent substitution can execute the wrong action.

Claude Certified Architect - Foundations (CCAR-F) (CCA-F) Practice Tests